This WWTP was the first large scale SBR plant in Hungary. It was built out in two phases, with a final capacity of 8 400 m3/d and 59 000 PE. We designed andThis WWTP was the first large scale SBR plant in Hungary. It was built out in two phases, with a final capacity of 8 400 m3/d and 59 000 PE. We designed and commissioned both phases. The plant was honored with the Tierney Clark price (Institution of Civil Engineers Midlands Association, Hungarian Chamber of Engineers, Association of Hungarian Consulting Engineers and Architects) and with the Lampl Hugó award (Hungarian Hydrological Society).