As part of complex preparatory planning, the following sub-tasks has been prepared: soil protection plan, forest demand plan, public utility plans, expropriation plans, cultivation change procedure, reservoir registration,spatial planning of the settlements, concept of solar energy utilization (design the necessary license plans). Capacity: 350 pieces of land, 11 km gas pipeline, 800 m optic cable, 400 m drinking water pipeline, 400 m sewer, 150 kW solar power