Having more than 15 years experience in the field of water solutions, we are proud of the significant and marketable domestic and international project portfolio of our companies and the vast experience of their professional experts.
Carring out electrical resistivity tomography (ERT) measurements for drinking water supply purposes in Vlăhița (Băile Homorod), Dârjiu, Reci, Atid, Lupeni and Joseni.
The trial operation of PurAID® modular, mobile, pallet-based water purification equipment installed in the settlement of Akim Wenchi, was completed. Iron and manganese impurities and disease-causing bacteria were removed from the water of the public wells of the town of 12,000 inhabitants.
Preparation and donation of an arsenic removal equipment combined with a disinfectant to a kindergarten in Hanoi
The Petecu drilling was completed first with a yield of 4 m3/hour, followed by the Daia drilling with a yield of 5 m3/hour. For the last occasion, the Obrănești borehole was drilled, an artesian well with a yield of 5 m3/hour.
New WWTP using physico-chemical pretreatment with flotation and IFAS technology.
In Serbia, the concentration of arsenic and iron in drinking water in the municipalities of Magyarkanizsa and the Municipality of Subotica in many cases significantly exceeds the health limit values.
In order to solve the regional water supply of Valea Ierului in Bihor region, Romania, several national and European Union-funded projects have already been implemented. Participatinn in a drinking water research, the team worked on behalf of...
Placement of two S2N Smart Buoys in the Lobau quarter of Vienna
Arsenic free irrigation water by using a 25 liter arsenic removal adsorbent connected to a mechanical pre-filtration system.
Retaining existing moisture in the soil and reducing evaporation loss
Water-purification and service system construction.
Geogold Kárpátia carried out a second groundwater exploration campaign based on the first campaign in 2018; extending the focus to the broader region of Ngorongoro District in Northern Tanzania this time.
Extension and modernization of the wastewater treatment system.
Wastewater canalisation and treatment project.
Sewerage network and treatment system have been designed and implemented.
Planning and construction a wastewater treatment plant. Capacity: 2300 m3/d
Designing and implementing a municipal wastewater plant in Csömör
EU funded municipal wastewater treatment plant in Hungary
Extension and modernization of a wastewater treatment system
Planning and construction a municipal wastewater treatment plant. Capacity: 389 m3/d.
Designing and implementing an industrial wastewater plant.
Planning and constructing a sewerage network and treatment system.
Planning and construction a sewerage network and treatment system.
Engineering for the reconstruction of wastewater treatment plant in Vratsa.
Performing tasks related to the installation of the septic sewage treatment system.
Carrying out the septic sewage treatment system in Takoradi
Installing a septic sewage treatment plant in Ghana
Designing and implementing a leachate treatment system
Designing and implementing a leachate treatment system
Corrugated steel pipes had been installed in NEXEN TIRE Plant
Delivering the underground ductile pipes and fittings needed for the factory
Complex solution to solve the stormwater problem of the Zoo
A new wastewater treatment plant was built in a Hungarian town
Installing ENVIA TRP oil separators
Providing perfect stormwater retention
Odourless industrial activity at waste management plant
VENTUS biofilters have been built in for the wastewater treatment plan
Water-purification and service system construction
Developing and implementig a complex water treatment process
Ensuring the protection of the drinking water sources, sensitive areas
Designing and constructing a new technology for water quality
Executing the design and construction of the municipal wastewater treatment plant
Designing the card identification system for the septage vacuum trucks
Developing the settlement to provide the reduction of pollutant levels
Desingning the mechanical pre treatment unit, biological treatment, sludge dewatering, disinfection
Designing the mechanical pre treatment unit, biological treatment, sludge dewatering, disinfection
Designing an industrial WWTP with the capacity of 1440 m3/d)
Construction of water treatment plant, providing fresh, drinking water.
Market introduction and exclusive sales activity of a strategical water industrial product .
Sales activity of water treatment machine in China
Consulting and market research and analysis in China and Vietnam.
Design of a municipal SBR wastewater treatment plant in Makó (Hungary), built out in two phases.
Complete design of the Szentes wastewater treatment plant with Cyclator process.
Complete design of the communal WWTP with anaerobic digestion and composting.
A large-scale wastewater treatment plant with anaerobic digestion, DEMON technology and with bioCNG production in Zalaegerszeg (Hungary).
A turnkey installation with Cyclator technology.
Turnkey installation of a WWTP treating communal and winery wastewater.
Upgrading the existing wastewater treatment plant with Cyclator technology.
Municipal wastewater treatment plant with Cyclator process.
Municipal wastewater treatment plant with Cyclator technology
Municipal wastewater treatment plant with Cyclator process.
Turnkey installation of a Membrane Bioreactor technology.
Execution of an industrial WWTP with UASB technology.
Turnkey installation with a Low Temperature Distillation (LTDis) technology
Turnkey installation with anaerobic + aerobic treatment
Execution of an industrial WWTP with UASB technology.
Industrial wastewater treatment plant at Dreher Brewery in Budapest.
Turnkey installation of an Industrial wastewater treatment plant at Glencore in Foktő.
Using state-of-the art technologies to remove Cupper and Chromium from the wastewater.
Turnkey installation of an industrial wastewater treatment plant at Xellia.
Wastewater collection and treatment project
Preparation of preliminary environmental impact assessment of the planned activities.
Berhida Industrial Plant contaminated area remediation. Capacity: 1,3 hectar.
Monitoring of the Gönyű Power Plant - Bird and aquatic life, groundwater, surface water.
Preparation of a water licence and tender plan for the development
Planning and consulting for drinking water purification in Laos.
Tourism and sport development of the surrounding of Kisköre for the slalom kayak canoe course.
Programme preparation of chapters 6 to 11 of the feasibility study and final codification.
Preparation of long-term plan to replace water utilites focusing on the objects and object groups.
Strengthening the existing wastewater treatment plant
Wastewater canalisation of Vientiane Phase I. Capacity: 245 km sewer system
Drinking water purification. Providing drinking water supplies.
Planning and preparatory works of the development of Győr-Gönyű civil harbour.
Disposal and Utilization of Sewage Sludge in Budapest. Proposing several long-term solutions.
Application documentation for the EU funded project implementation of the Waste Management System.
Carrying out strategic revision and preparing wastewater sluge handling and disposal concept.
Carrying out the design tasks, provide technical and environmental expert and consultancy activities.
Preparation of the Kvassay Jenő Plan and review of the River Basin Management Plan
Tisza-Túr reservoir - plans: soil protection, forest development, public utility, expropriation, energy planning
Providing flexible operational alternatives for the present circumstances
WWTP Consultancy services, professional proofreading of co-authors' documents
Training Laos professionals on sewerage systems in English language
Knowledge transfer to Indonesia. Mini-Conference was held on water resources.
Developing a water management concept on wastewater recycling
S2N Water monitoring project „Microbial dynamics of river bank filtration”
S2N water network management and non revenue water loss reduction project
Public utility asset evaluation of the municipality-owned water public utility
Monitoring of wastewater pump shaft: energy consumption
Continuous water monitoring of intensive fish farm
Continuous monitoring of the lakes‘ water quality with our S2N Smart Buoy